Food & beverage / Godrej Jersey / Design partner

Giving packing and maintenance the same stop.

Milk and curd packing needed a shared record of the machine, the reason and the minutes lost. Recording time beyond each allowed stop made those losses visible to both teams.

Download case study PDF
₹1.83 crore

Additional revenue per month

Two plants; one-year comparison

2.8 → 0.5 h

Milk unplanned stops per day

Across 14 packing heads

70% → 84%

Curd packing OEE

Across eight packing machines

01 / THE CHALLENGE

The stop was recorded after the fact.

Across two plants and six lines, packing and maintenance could not see the same stop. The machine, its reason and the minutes were not held together in a record that both teams could use.

Planned stops had an allowed duration. When a stop ran beyond that allowance, the excess time did not stay attached to the machine. On milk packing, printer stops alone accounted for 3,664 minutes in the first month. Curd losses included power, hot water, batch delays and the incubation room.

02 / WHAT CHANGED

The reason and the extra minutes stayed on the machine.

Neuron recorded the operator’s selected reason alongside the stop’s start, end and duration. Minutes beyond the allowed time remained on that stop. Packing could see the lost time; maintenance could see its cause, using the same machine record.

The records made the specific losses measurable through the year. Milk printer-stop time fell to 135 minutes. On curd, power-stop time fell from 1,802 to 52 minutes and hot-water overruns from 3,373 to two minutes. Batch-delay and incubation-room losses reached zero.

03 / THE IMPACT

Milk and curd showed different parts of the gain.

Milk unplanned stops fell from 2.8 hours a day to 0.5 across 14 packing heads. The separately reported unplanned-downtime measure moved from 4.1 to 3.0 hours a day.

Curd packing OEE rose from 70% to 84% across eight machines. For the two-plant operation, the case reports ₹1.83 crore in additional monthly revenue over the one-year comparison.

04 / THE FIGURES

The losses, measured on the machines.

Godrej Jersey / Design partner — reported comparison
MeasureFirst monthLast month
Milk: unplanned stops / day2.8 h0.5 h
Milk: unplanned downtime / day4.1 h3.0 h
Milk: printer stops3,664 min135 min
Curd: OEE70%84%
Curd: power stops1,802 min52 min
Curd: hot-water overruns3,373 min2 min

Godrej Jersey, two plants and six lines, one-year comparison. Milk covers 14 packing heads; curd covers eight packing machines. Daily hours are monthly minutes divided by calendar days: 31 in the first month and 30 in the last. Unplanned stops and unplanned downtime are separate measures in the source.