PATTERNLAB / CUSTOMER STORIES

Decisions that
change the day.

What becomes possible when teams can see how their operations fit together.

Eleven stories. From the factory floor to the delivery promise.

Explore the stories

Explore the stories.

11 STORIES
Godrej Jersey / Design partner

Giving packing and maintenance the same stop.

Milk and curd packing needed a shared record of the machine, the reason and the minutes lost. Recording time beyond each allowed stop made those losses visible to both teams.

₹1.83 croreAdditional revenue per monthTwo plants; one-year comparison
Confectionery production

Less time waiting. More candy produced.

Material delays and missing bins were holding back a candy line. Connecting output to the reasons for each stop helped the team act on the losses behind the daily total.

₹3 lakhAdditional revenue per dayCandy production
High-speed bottling

Above the goal, with fewer mechanical stops.

As production shifted from 60 ml bottles to mainly 90 ml, the team needed a reliable run. Mechanical interruptions gave maintenance a clear place to start.

₹4.8 lakhRevenue per dayTotal daily revenue in Month 2, not the increase
Two ceramic tile plants

Putting each tile size on the right press.

Two plants made the same sizes at different speeds. Planning needed to compare each size at each plant before deciding where production should run.

₹11 lakhAdditional monthly revenuePlant-level monthly increase
Epoxy-coated rebar production

Knowing what a stopped minute costs in tonnes.

Bar diameter changes how much production is lost during a stop. Connecting diameter, coating rate and downtime helped production and maintenance prioritise their response.

₹1.1 croreAdditional monthly revenueCoating operations
API manufacturing

A shorter plan for the same 91 batches.

Thirteen orders had to run across 80 reactors. Scheduling the orders, batch sequence and reactors together shortened the monthly plan by four days and twelve hours.

₹38.6 croreWorking-capital opportunityAnnual inventory-turn comparison
Avanti Frozen · Design partner

Lower energy use for every kilogram frozen.

Frozen output and the electricity bill were separate totals. Avanti Frozen connected kilograms and kilowatt-hours on each freezer to understand energy intensity as production grew.

₹4.3 lakhMonthly energy savingOver the one-year comparison
Avanti Frozen · Design partner

One delivery promise across three plants.

Three plants, nine lines and more than 100 SKUs. Checking orders, capacity and material together gave planning and each plant the same answer before a delivery was promised.

63% → 78%On time in full15 percentage points
Gowell Industries

From separate chats to one dealer order.

Stock, payment, dispatch and purchase lived in different WhatsApp conversations. One order now carries the information each team needs to move the work forward.

₹1.5 croreReported revenue increaseAbout 36% in one month
Poultry processing

Filling the same orders with fewer birds.

Breast and leg orders had each been planned as a full bird. Planning the cuts together reduced the live-bird requirement while filling the same chilled orders.

₹24 lakhLess spent on live birds per day10,000 fewer birds purchased
Folding cartons & pharmaceutical leaflets

Checking the press before promising the date.

A quote could look right on paper and reach a press that could not hold the sheet. Linking specification, machine fit and ship date moved that check to approval.

₹60 lakhAdditional revenue per monthFrom orders now shipping complete; three-month comparison
YOUR OPERATIONS

What could your team
see together?

Talk to us