Checking the press before promising the date.

A quote could look right on paper and reach a press that could not hold the sheet. Linking specification, machine fit and ship date moved that check to approval.

Download case study PDF
₹60 lakh

Additional revenue per month

From orders now shipping complete; three-month comparison

₹3.1 crore

Working capital unlocked

Inventory throughput rose from 6.2× to 7.4×

68% → 83%

On-time, in-full delivery

A 15 percentage-point improvement in three months

01 / THE CHALLENGE

The delivery problem arrived at the press.

Customer requirements arrived across emails, PDFs and artwork. Estimating used a spreadsheet, planning used another, and the floor worked from a printout. The promised delivery date could move between those handoffs without the job carrying that change.

Machine fit was also judged by hand. A sheet that no press could hold might be discovered only when it reached production. On-time, in-full delivery stood at 68%.

02 / WHAT CHANGED

Approval became a check on what the plant could make.

Neuron turned the enquiry into a specification and costed the blank, the number of blanks on the press sheet, ply, plate and die. A quotation that had taken a day could be returned in a couple of minutes.

Approval checked the press sheet against each machine in either orientation. If no machine could hold it, the job stopped at approval with the reason. For an approved job, the sequence became its production route, naming suitable machines and carrying the ship date. Planning and the floor could follow the same job.

03 / THE IMPACT

More complete shipments, with less board tied up.

Over three months, on-time, in-full delivery rose to 83%. The case reports about ₹60 lakh in additional monthly revenue from orders that now shipped complete, alongside a 12% increase in orders.

Inventory throughput increased from 6.2× to 7.4×. Across ₹16 crore of board inventory, the case reports ₹3.1 crore of working capital unlocked. Faster quoting and the machine-fit check addressed different parts of the same enquiry-to-shipment process.

04 / THE FIGURES

From enquiry to complete shipment.

Folding cartons & pharmaceutical leaflets — reported comparison
MeasureStarting pointAfter three months
On-time, in-full delivery68%83%
Quotation turnaroundA dayA couple of minutes
OrdersStarting volume12% more
Inventory throughput6.2×7.4×

Folding cartons and pharmaceutical leaflets, three-month comparison. ₹60 lakh is additional monthly revenue from orders now shipping complete. Working capital unlocked is reported against ₹16 crore of board inventory; it is distinct from revenue.

Read the full case study PDF
PUT CONTEXT TO WORK

Start with the question
your team needs to answer.

Talk to us Try Neuron free